FieldHive Renewables · Closed beta

Compliance paperwork for MCS solar and battery installers

Type the inverter, panels and serial numbers once. Every MCS form after that already has them.

Nothing to download, fill in again and upload back. Your customer signs on their phone.

10 closed beta places · applications open

  • Built by an MCS installer
  • The MCS clause on every checklist item
  • 6 months free for beta testers
FieldHive Renewables job screen: a Do this next card names the Customer Commitment and its clause, above the five job steps
The same job on a phone, with the Do this next card and the survey and design checklist

Job screens shown with test data.

OnceKit details typed once, then on every form after
30 daysMCS certificate clock from commissioning, counted for you
5 stepsSurvey to handover, with one task to do next
PhoneCustomer reads and signs with no account
Type it once

Enter it once. It's on every form after that.

MCS paperwork asks for the same facts again and again: the inverter make and serial, the panel figures, the battery, the dates, the test results. With a folder of Word forms you download each one, type it all in again, save it and upload it back to the job.

In FieldHive Renewables the form is the screen. Facts you have already entered are filled in and labelled with where they came from, like "From the survey". Anything you type yourself is never overwritten, and the finished PDF is saved to the job.

  • No forms to download or upload again
  • Kit, serials and dates carried from form to form
  • Answers you typed are never replaced
  • Every saved form is a numbered version, and older versions are kept
Site survey on a phone: the engineer answers each question on site, and a worrying answer only shows a note
Reading files

Snap it instead of typing it

Drop in the electricity bill, the design, a datasheet or photos of the kit. It reads them and suggests the answers, showing which file it read and the text it saw.

You check each suggestion and tap to accept it. It never fills in a form, signs or sends anything on its own.

  • Up to 5 files at once
  • Each suggestion shows the file and the text it came from
  • Nothing is saved until you accept it
Know what's next

Always know what to do next

Each job runs in five steps, from survey and design to handover and certificate. A Do this next card names the one task to do, why it matters and how many days are left.

About 41 checklist items each show the MCS document and clause they come from, so you can check the source yourself. The 30 days to raise the MCS certificate after commissioning are counted for you.

  • Tasks appear only when they apply: solar, battery, G98 or G99
  • Insurance and qualification warnings 60 days before they expire
  • It warns you. It never blocks you
Jobs list in FieldHive Renewables showing each job's stage, status and how many documents are done
Signed on a phone

Your customer signs on their phone

Send a private link. Your customer needs no account. They read each pack, confirm they have read it and sign with their name and a drawn signature.

You can see whether each pack was sent, opened and acknowledged, and every signed copy carries a fingerprint of exactly what was signed.

Customer page on a phone: what happens next, from getting started to the MCS certificate, and anything waiting to sign
How it works

From survey to certificate

  1. Survey and design

    Customer Commitment, site survey, roof checks and the design figures, entered once.

    Customer Commitment 1a
  2. Quote and contract

    Your quote, then the contract and cancellation notice in MCS wording, signed on the customer's phone.

    Customer Commitment 4b
  3. Install

    Risk assessment, installation and supervision records, and battery location checks.

    IOR 5.7
  4. Test and commission

    PV inspection, array tests and commissioning with the kit already filled in, then Technical Supervisor sign-off.

    MIS 3002 Appendix C
  5. Handover and certificate

    Handover documents, guarantee and pack, with the 30 days to raise the MCS certificate counted for you.

    IOR 4.10
Closed beta

10 places for MCS solar and battery installers

We’re opening FieldHive Renewables to 10 small installers first, so we can work through every problem with each of you before launch.

10places · applications open

Beta testers get

  • 6 months free
  • No limit on jobs during the beta
  • £20 of AI credits to read bills, datasheets and photos
  • A report-a-problem bar on every screen
  • 30 days' notice before you pay anything

We ask you to

  • Run at least one real job through it, from survey to handover
  • Tell us what's missing or wrong on a short call
  • If it works for you, let us publish a short comment from you

We reply to every application within 2 working days.

I’m an electrician and an MCS installer. The MCS software I used carried the customer details across, but I still downloaded each form, typed the inverter, panels and serials in again, saved it and uploaded it back. So I built one where you type them once.
Daniel Sanders · Founder, FieldHive
Step 1 of 2

Apply for a place

Your MCS status

Nothing to pay for 6 months. 30 days’ notice before you pay anything.

We use your details only to review your application and contact you about the beta. Privacy policy

Not ready for the beta?

Get one email when FieldHive Renewables launches. Nothing else.

One email at launch. Unsubscribe any time. Privacy policy

Sources

Where each requirement comes from

Every checklist item shows its source, so you can check it against the official document. A few examples:

  • Customer Commitment given before the contract

    Customer Commitment 1a · IOR 6.2Customer Commitment v1.1 and Installer Operating Requirements 2.0
  • MCS certificate raised within 30 days of commissioning

    IOR 4.10Installer Operating Requirements 2.0
  • Roof structure checked by a competent person

    MIS 3002 3.9.3MIS 3002 Issue 2.0
  • Battery location chosen with arc-flash energy in mind

    MIS 3012 3.7.5MIS 3012 Issue 1.0

Examples of the sources behind the checklist. Check the current MCS documents for the scheme version you work to.

FAQ

FieldHive Renewables is independent software. It is not affiliated with or endorsed by MCS or any certification body.

Run your next MCS job through it

10 places in the closed beta. Beta testers get 6 months free.

-->