For MCS solar and battery installers

MCS Paperwork Software

MCS paperwork software that works out the documents each solar or battery job needs and fills them from one record.

No more downloading a Word file, typing the same kit details again, printing, signing and uploading.

10 closed beta places · applications open

  • MCS wording quoted exactly
  • Upload what you made elsewhere
  • 6 months free for beta testers
MCS Paperwork Software: FieldHive Renewables job screen: a Do this next card names the Customer Commitment and its clause, above the five job steps
The same job on a phone, with the Do this next card and the survey and design checklist

Job screens shown with test data.

Enter the customer once

A new job asks for the customer and site in UK format. Every document for that job reads from it, so the address, system details and dates are typed one time.

  • Company details, MCS numbers, logo and colours print on every document
  • Header, footer and page numbers are added for you
  • Anything you have not entered prints blank. The software never fills facts in for you

Each requirement shows where it comes from

Every checklist item carries its MCS clause. Where a form quotes MCS wording, it is copied exactly, with its clause.

  • Items grouped by stage so you know what comes next
  • Documents made in other tools attached to the matching item
  • Re-creating a document keeps the older version
Jobs list in FieldHive Renewables showing each job's stage, status and how many documents are done

Signed on a phone, filed on the job

The customer opens a private link, reads what they are signing and draws their signature. The signed copy is filed with the job. Saved versions are never overwritten.

An installer handing a blue folder of handover documents to a homeowner at their front door

The documents it makes

  1. Customer Commitment letter

    Created and signed before the contract.

  2. MCS handover documents

    For solar PV and for battery installs.

  3. Handover pack and written guarantee

    Key parts, health and safety guidance, servicing, manuals, guarantees and warranties.

  4. Test and commissioning records

    PV array test report, battery commissioning checklist and generation meter record.

  5. Supervision and subcontractor records

    Installation and supervision record with Technical Supervisor sign-off, subcontractor letter and existing-warranty letter.

Closed beta

10 places for MCS solar and battery installers

We’re opening FieldHive Renewables to 10 small installers first, so we can work through every problem with each of you before launch.

10places · applications open

Beta testers get

  • 6 months free
  • No limit on jobs during the beta
  • £20 of AI credits to read bills, datasheets and photos
  • A report-a-problem bar on every screen
  • 30 days' notice before you pay anything

We ask you to

  • Run at least one real job through it, from survey to handover
  • Tell us what's missing or wrong on a short call
  • If it works for you, let us publish a short comment from you

We reply to every application within 2 working days.

I’m an electrician and an MCS installer. The MCS software I used carried the customer details across, but I still downloaded each form, typed the inverter, panels and serials in again, saved it and uploaded it back. So I built one where you type them once.
Daniel Sanders · Founder, FieldHive
Step 1 of 2

Apply for a place

Your MCS status

Nothing to pay for 6 months. 30 days’ notice before you pay anything.

We use your details only to review your application and contact you about the beta. Privacy policy

Not ready for the beta?

Get one email when FieldHive Renewables launches. Nothing else.

One email at launch. Unsubscribe any time. Privacy policy

Sources

Where each requirement comes from

Every checklist item shows its source, so you can check it against the official document. A few examples:

  • Customer Commitment given before the contract

    Customer Commitment 1a · IOR 6.2Customer Commitment v1.1 and Installer Operating Requirements 2.0
  • Performance estimate in the MCS Table 5 format before the contract

    MCS 032 6.1MCS 032 Issue 1.0
  • Roof structure checked by a competent person

    MIS 3002 3.9.3MIS 3002 Issue 2.0
  • Battery location chosen with arc-flash energy in mind

    MIS 3012 3.7.5MIS 3012 Issue 1.0

Examples of the sources behind the checklist. Check the current MCS documents for the scheme version you work to.

Try it on one real job

10 places. Beta testers get 6 months free. Two short steps.

FAQ

FieldHive Renewables is independent software. It is not affiliated with or endorsed by MCS or any certification body.

Stop retyping the same paperwork

10 places in the closed beta. Beta testers get 6 months free.

-->