For MCS solar and battery installers
Solar PV Handover Pack
Solar PV handover pack: the documents your customer must be given when the install is finished, built from the job details you enter once.
The checklist shows what is missing and which MCS clause each item comes from.
10 closed beta places · applications open
- Branded PDFs from one job record
- MCS clause beside each item
- 6 months free for beta testers

Job screens shown with test data.
What goes in the handover documents
Each solar job gets the documents its checklist calls for. The software makes the branded PDFs and you add anything made elsewhere.
- MCS handover document for solar PV
- Handover pack: key parts, health and safety guidance, servicing schedule, manuals, guarantees and warranties
- Written guarantee for design and workmanship
- PV array test report and generation meter record
- Battery jobs add their own MCS handover document and commissioning checklist


Worked out from the job, not typed again
The checklist is computed from the facts of the job. A pitched roof adds a roof structure check. A flat roof adds a different set.
Status pills come only from the dates you enter, so a new job is never flagged for facts you have not had time to add. Red is kept for real deadlines, such as the 30-day window for the MCS certificate.
- Five steps from survey to handover, with one task to do next
- A prompt before you move on with items outstanding, and your choice is recorded
- Every change written to an activity log: who, what, when

The customer signs on their phone
You send the customer a private link. They open it on their phone with no account, see what to sign and read a plain-English timeline of what happens next.
They draw a signature and tick an agreement. The signed copy records their name, the date and time, the wording they agreed and a fingerprint of the exact document they saw. It is filed on the job.
- Links last 30 days and can be switched off
- Only the documents you choose to share are shown
- Staff can preview the page but cannot sign for the customer

How a pack comes together
Enter the job once
Customer, site, technology, engineer, Technical Supervisor and dates.
See what is missing
The checklist lists the documents the job needs and why.
Create the documents
Branded PDFs with your logo, MCS numbers and page numbers.
Add what was made elsewhere
Upload risk assessments or certificates against the matching item.
Get it signed and filed
The customer signs on their phone and the signed copy joins the job record.
10 places for MCS solar and battery installers
We’re opening FieldHive Renewables to 10 small installers first, so we can work through every problem with each of you before launch.
Beta testers get
- 6 months free
- No limit on jobs during the beta
- £20 of AI credits to read bills, datasheets and photos
- A report-a-problem bar on every screen
- 30 days' notice before you pay anything
We ask you to
- Run at least one real job through it, from survey to handover
- Tell us what's missing or wrong on a short call
- If it works for you, let us publish a short comment from you
We reply to every application within 2 working days.
I’m an electrician and an MCS installer. The MCS software I used carried the customer details across, but I still downloaded each form, typed the inverter, panels and serials in again, saved it and uploaded it back. So I built one where you type them once.
Daniel Sanders · Founder, FieldHiveNot ready for the beta?
Get one email when FieldHive Renewables launches. Nothing else.
Where each requirement comes from
Every checklist item shows its source, so you can check it against the official document. A few examples:
Customer Commitment given before the contract
Customer Commitment 1a · IOR 6.2Customer Commitment v1.1 and Installer Operating Requirements 2.0Performance estimate in the MCS Table 5 format before the contract
MCS 032 6.1MCS 032 Issue 1.0Roof structure checked by a competent person
MIS 3002 3.9.3MIS 3002 Issue 2.0Battery location chosen with arc-flash energy in mind
MIS 3012 3.7.5MIS 3012 Issue 1.0
Examples of the sources behind the checklist. Check the current MCS documents for the scheme version you work to.
Build a handover pack from a real job
10 places. Beta testers get 6 months free. Two short steps.
FAQ
FieldHive Renewables is independent software. It is not affiliated with or endorsed by MCS or any certification body.

Build your next handover pack in it
10 places in the closed beta. Beta testers get 6 months free.