For MCS solar and battery installers
MCS Handover Pack
MCS handover pack: the stage at the end of every job where the customer receives their documents and the 30-day items are raised.
FieldHive Renewables gives that stage its own tab on the job, with each item ticked off as it is done and who did it.
10 closed beta places · applications open
- Handover and 30-day items in one tab
- Solar PV and battery
- 6 months free for beta testers

Job screens shown with test data.
The handover stage on the job
Handover is a tab on the job. It lists the items for this installation and shows which are done, who did them and when.
- MCS handover document, made for solar PV or for battery
- Handover pack: key parts, health and safety guidance, servicing schedule, manuals, guarantees and warranties
- Written guarantee for design and workmanship
- A reminder that financial protection has been explained and purchased

After handover: the items with deadlines
The checklist keeps the post-handover items beside the pack so they are not forgotten. The 30-day window for raising the MCS certificate is shown as a real deadline, and red is kept for exactly that kind of date.
- Building regulations certificate and DNO proof sent to the customer
- MCS certificate number recorded once you raise it with MCS
- Optional records you choose to keep
What the customer sees
The customer gets a private page on their phone with what to sign, a timeline of what happens next and the documents you chose to share. They need no account, and you can switch the link off.

From install to filed
Testing and switching on
Test report, commissioning record and generation meter record on the job.
Handover
Handover document, pack and written guarantee created and filed.
Customer signs
On their phone, with the signed copy kept on the job.
30-day items
You raise the MCS certificate with MCS and record the number. The certificates and proof go to the customer.
10 places for MCS solar and battery installers
We’re opening FieldHive Renewables to 10 small installers first, so we can work through every problem with each of you before launch.
Beta testers get
- 6 months free
- No limit on jobs during the beta
- £20 of AI credits to read bills, datasheets and photos
- A report-a-problem bar on every screen
- 30 days' notice before you pay anything
We ask you to
- Run at least one real job through it, from survey to handover
- Tell us what's missing or wrong on a short call
- If it works for you, let us publish a short comment from you
We reply to every application within 2 working days.
I’m an electrician and an MCS installer. The MCS software I used carried the customer details across, but I still downloaded each form, typed the inverter, panels and serials in again, saved it and uploaded it back. So I built one where you type them once.
Daniel Sanders · Founder, FieldHiveNot ready for the beta?
Get one email when FieldHive Renewables launches. Nothing else.
Run your next handover from one screen
10 places. Beta testers get 6 months free. Two short steps.
FAQ
FieldHive Renewables is independent software. It is not affiliated with or endorsed by MCS or any certification body.

Finish every job with the paperwork done
10 places in the closed beta. Beta testers get 6 months free.