PV Array Test Report

PV array test report: the record of each string's test results that an MCS solar installer keeps for the job and puts in the handover pack.

Fill it in on your phone on site. The inspector, date and test instruments are already there, and the finished PDF is saved to the job.

10 closed beta places · applications open

  • Laid out to MIS 3002 Appendix C
  • Test instruments from your register
  • 6 months free for beta testers
PV array test report in FieldHive Renewables: type of verification, date, inspector filled in from the job, and the test instrument with its calibration date
The same PV array test report on a phone, filled in on site

Shown with test data.

Per stringA test table with a column for each string
RegisterTest instruments picked from your list, with calibration dates
PhoneFilled in on site, no forms to download
PDFYour logo and job reference, saved to the job
What goes in it

What a PV array test report records

MIS 3002 Appendix C sets out the test report for a solar PV array, adapted from BS EN 62446-1. FieldHive Renewables builds the report on that basis.

  • Initial or periodic verification, the date, a reference and the inspector
  • The test instruments used, with their calibration dates
  • String by string: module quantity, Voc and Isc, and the protective device details
  • The isolator and inverter details
  • The reference you put on the MCS handover document
PV array test report on a phone: type of verification, reference, date, inspector and test instruments
Type it once

No blank form to fill in by hand

A downloaded template means typing the inverter, the panels and the engineer again on every job. Here the form is the screen. Facts already on the job are filled in and labelled, like "From Job details", and anything you type yourself is never overwritten.

Pick the test instrument from your register and its make, model, serial and calibration date go on the report. Save it and the branded PDF is filed with the job as a numbered version. Saving again makes a new version and keeps the old one.

  • Works at phone width, so it is filled in on the roof or at the inverter
  • Warnings are advice only. They never stop you saving
  • Blank lines print for anyone signing by hand
Part of the job

Where it sits in the job

The PV array test report is one task in the test and commission step, next to the PV inspection record, the electrical installation certificate record and the generation meter record. When it is done, the job moves on to the Technical Supervisor sign-off and then handover.

A FieldHive Renewables job in five steps, with a Do this next card naming the next task

What it does not do

It does not take the readings for you, and it does not check them against BS EN 62446-1 or BS 7671. The test results are yours, and you decide whether they pass. It is not the electrical installation certificate: the app keeps a record of that certificate alongside.

How it works

From test to handover pack

  1. Open the job

    The inspector, date and job details are already filled in.

  2. Pick your instrument

    Choose it from your register. Its calibration date comes with it.

  3. Enter the string tests

    One column per string, on a phone or a computer.

  4. Save the PDF

    Branded, numbered and filed with the job, ready for the handover pack.

    MIS 3002 Appendix C
Closed beta

10 places for MCS solar and battery installers

We’re opening FieldHive Renewables to 10 small installers first, so we can work through every problem with each of you before launch.

10places · applications open

Beta testers get

  • 6 months free
  • No limit on jobs during the beta
  • £20 of AI credits to read bills, datasheets and photos
  • A report-a-problem bar on every screen
  • 30 days' notice before you pay anything

We ask you to

  • Run at least one real job through it, from survey to handover
  • Tell us what's missing or wrong on a short call
  • If it works for you, let us publish a short comment from you

We reply to every application within 2 working days.

I’m an electrician and an MCS installer. The MCS software I used carried the customer details across, but I still downloaded each form, typed the inverter, panels and serials in again, saved it and uploaded it back. So I built one where you type them once.
Daniel Sanders · Founder, FieldHive
Step 1 of 2

Apply for a place

Your MCS status

Nothing to pay for 6 months. 30 days’ notice before you pay anything.

We use your details only to review your application and contact you about the beta. Privacy policy

Not ready for the beta?

Get one email when FieldHive Renewables launches. Nothing else.

One email at launch. Unsubscribe any time. Privacy policy

Sources

Where the layout comes from

  • Test report for the solar PV array

    MIS 3002 Appendix CMIS 3002 Issue 2.0

Check the current MCS documents for the scheme version you work to.

Fill in your next PV array test report on site

10 places. Beta testers get 6 months free. Two short steps.

FAQ

FieldHive Renewables is independent software. It is not affiliated with or endorsed by MCS or any certification body.

Fill in your next PV array test report on site

10 places in the closed beta. Beta testers get 6 months free.

-->