Electrical Installation Certificate Template
Electrical installation certificate template for new work to BS 7671:2018+A4:2026, filled in on screen: the client and installation, what the new work covers, the design, construction and inspection signatures (or one signature for all three), the supply and earthing, the schedule of inspections and one schedule of circuit details and test results per board, with the maximum Zs filled in and checked. Free, no sign-up. You certify; we supply the form.
1 The work — what this certificate covers
2 Client and installation — sections 1 to 3
Export this electrical installation certificate
The A4 PDF is free to download now. Enter your email once to unlock the editable Word version and add your own logo.
- Editable Word template — reword it and reuse it
- Your own logo on the document (PDF & Word)
Want more FieldHive tools in your Google results?
Google lets you choose the sites you want to see more of. Add FieldHive as a preferred source and our free trade tools show up more often when you search.
Add FieldHive as a preferred sourceOne click. You can change it any time in your Google settings.Was this tool useful?
We keep our trade tools free to use — no sign-up to run them and no pop-ups. If it helped, an honest review helps us improve these tools and helps other trade businesses find them.
Leave an honest Google reviewReviews are optional. Please only review based on your genuine experience.Page one gives you a blank form to print — none of them fills in or checks anything
Search 'electrical installation certificate template' and you get the IET's model forms, an older NET form, two council PDFs, a PDF-filler page, a Scribd upload and one template page. Every one of them is a blank to print and fill by hand after the job, and none of them works out the maximum Zs for a circuit or tells you when a reading is out.
This template is filled in on screen and prints as the finished certificate. The first page is the EIC itself — client, installation, the extent of the new work, the declarations and the next inspection. The supply, earthing and particulars follow, then the schedule of inspections and a landscape schedule of circuit details and test results for each board, with the maximum Zs filled in from BS 7671 and any reading that is out flagged before you download.
Five steps, the certificate available at every one
Client and installation
Pick a quick start — consumer unit replacement, new circuit, EV charge point circuit, full rewire or new build — and it fills the type of work, the description and the extent. Change anything after.
Supply and earthing
Earthing arrangement, Ze, Ipf, the supply fuse, the means of earthing, the earthing and bonding conductors and the main switch — the same particulars as the condition report.
Boards and circuits
One landscape schedule per board. Quick-fill a typical circuit; the maximum Zs fills in for the device type and rating, and readings that are out of range are flagged.
Schedule of inspections
Set every item to inspected and complies in one tap, then mark what doesn't apply as N/A. New work has no condition codes.
Declaration
One signature for design, construction, inspection and testing — or three, when different people were responsible. Sign on screen or leave the boxes to sign on paper.
An EIC is for new work — and Amendment 4 is mandatory from 15 October 2026
BS 7671 requires an Electrical Installation Certificate for a new installation and for an addition or alteration to an existing one — in practice a rewire, a new circuit or a consumer unit replacement. An addition or alteration that does not include a new circuit can go on a Minor Electrical Installation Works Certificate instead; the condition of an existing installation goes on an Electrical Installation Condition Report. The certificate is only valid with its schedules attached.
Amendment 4 to BS 7671:2018 was published on 15 April 2026 and is mandatory for new work from 15 October 2026; the template defaults to A4:2026 and lets you choose an earlier amendment where that is the one the work was designed to. In homes, some work is notifiable under Part P of the Building Regulations — a new circuit, a consumer unit replacement, and work in a room with a bath or shower — and the building control compliance certificate is separate from the EIC.
Everything the EIC and its schedules record
Which certificate the job needs
Electrical Installation Certificate
New installations, rewires, new circuits and consumer unit changes. Signed for design, construction and inspection and testing — once or three times.
Minor Works Certificate
An addition or alteration that does not add a new circuit — an extra socket, a replaced accessory, a moved light. One page.
Condition Report (EICR)
The condition of an existing installation — landlord checks, house sales, periodic inspection. It reports, it does not certify new work.
Schedule of test results
The test results on their own, one sheet per board — for your records, or to go behind any of the three.
Sits with the other certificates, the O&M pack and the invoice
A consumer unit change or a new circuit usually comes with an isolation record on the day, a minor works certificate for anything small done on the same visit, and a handover pack for the client. The certificate number and dates carry through, and your firm, scheme number, signatures and instruments are remembered on this device for the next one.
You design, install, test and certify. We supply the form.
This tool lays out the certificate and its schedules and prints them. It does not test anything, it does not decide whether the work complies, and it does not notify building control. The person or people named in the declaration are responsible for the work and for the certificate.
It is FieldHive's own layout on the content BS 7671 requires an electrical installation certificate to record — not a reproduction of the IET model form, and it carries no IET logo. Where you are registered with a scheme, use the scheme's own certificate if its rules require it.
Turn it into a connected job workflow
FieldHive keeps the enquiry, quote, job, invoice and payment connected — so it's built from the accepted quote instead of retyped, and the numbers carry through.
Other free tools for your trade
More FieldHive document tools — and the calculators behind the figures.
Schedule of Test Results Template
The schedule of circuit details and test results on its own — one landscape sheet per board, max Zs checked.
record the test results →Minor Electrical Installation Works Certificate
For work that does not add a new circuit — one page, the same test results.
certify minor work →Electrical Installation Condition Report Template
The EICR for an existing installation — observations, codes and the same schedules.
report on an installation →O&M Manual Template
Hand the client the certificate inside a proper handover pack — equipment, maintenance and certificate register.
build the handover pack →Electrical installation certificate questions
Quick answers to the questions people ask most.
The certificate is one sheet in the job
The EIC goes to the client with the invoice and, for notifiable work, the building control certificate. FieldHive keeps the enquiry, quote, job, invoice and payment connected for that customer — the certificate is the one thing it leaves to you.



