FREE RAMS TEMPLATE

RAMS Template

RAMS template — a free risk assessment and method statement generator laid out the way a principal contractor reads it: the job and the sequence of work first, then the risk assessment underneath — hazard, possible risks, required control measures — with the mandatory PPE and the emergency arrangements to settle before work starts. Pick a quick start for the kind of job (MEWP work, working at height, electrical installation, plumbing and heating, general site work) and the whole pack fills in for you to adapt to the site. Free, no sign-up, no account. A competent person prepares it; we supply the form.

No account needed to use it · For contractors asked for RAMS by a principal contractor, a client or a site
Your details save automatically in this browser — nothing is sent anywhere.
Keeps your company, you, your signature, welfare text and the competence cards; clears the job, method, hazards and PPE; next number (RAMS-002).
Your branding on the RAMS — logo in the header, your colour on the section bars
🖼️ Company logo
Header, top left. PNG, JPG or SVG.
🔒 Unlock free with your email ↓
🎨 Section bar colour
Your brand colour, or leave FieldHive blue.
🔓 The logo unlocks free with your email in the export panel — the PDF is free either way.
Quick start — the job type — fills the description, method, PPE, hazards and emergency arrangements for that kind of job; then edit it for this site

1 The job

2 Method statement — the sequence of work, in order

1

3 Plant, PPE, competence and permits

Competence and training cards — optional; who is doing the work and the card that says they can (prints as a table)
1

4 Risk assessment — hazard, possible risks, required control measures; rate likelihood × severity

Hazard library — adds a hazard with the usual controls and a starting rating; edit anything
Risk 6 · Low
Highest current risk: — · 0 hazards · the print carries the 5×5 matrix legend

5 Emergency arrangements — before work starts, one line each

6 Prepared and approved by

Signature — prepared and approved by
Draw with a finger, mouse or stylus. Or leave it blank and sign the printed sheet.
The printed pack carries the approval statement over a record-of-briefing table — five lines for the operatives to sign that they have read and understood it before work starts.
The RAMS pack as it prints — A4, the job and method first, the risks underneath
This is the document as it prints, page by page — the breaks you see here are the breaks in the PDF. The risk table always has at least four rows.

Export this RAMS pack

The A4 PDF is free to download now. Enter your email once to unlock the editable Word version and add your own logo.

🔓 Unlock 2 extras with your email — free
  • Editable Word template — reword it and reuse it
  • Your own logo on the document (PDF & Word)
Google preferred sources

Want more FieldHive tools in your Google results?

Google lets you choose the sites you want to see more of. Add FieldHive as a preferred source and our free trade tools show up more often when you search.

Add FieldHive as a preferred sourceOne click. You can change it any time in your Google settings.
Want this tool on your own website? It's free.

Was this tool useful?

We keep our trade tools free to use — no sign-up to run them and no pop-ups. If it helped, an honest review helps us improve these tools and helps other trade businesses find them.

Leave an honest Google reviewReviews are optional. Please only review based on your genuine experience.
The problem

Every free RAMS template is two blank documents; every on-screen one wants your email first

Search 'rams template free' and page one is HSE's risk assessment template (no method statement), two Word files from a software vendor, five PDFs from an AI-writing app, a consultancy's email-gated download, a CRM sign-up form and two apps that need an account. Nothing on the page produces the two documents together, from one set of details, without a login.

This form does it the other way round. Pick the job type and the pack fills in: what the job is, the sequence of work, the plant and PPE, the hazards with their possible risks and required control measures, the emergency arrangements. Then you adapt it to the site — that is the work a competent person actually does. One PDF, the method first and the risks underneath, free.

The job and the method first, the risks underneath. Quick starts for five job types. Free, no account.
How it works

Pick the job type, describe the job, adapt the hazards, sign

1

Quick start, then the job

MEWP work, working at height, electrical installation, plumbing and heating, or general site work. The description, personnel, minimum competence, plant, PPE, steps, hazards and emergency arrangements fill in. Replace the [brackets] in the description with what you are actually doing, add the site, client, dates and who is at risk.

2

The method, then the risks

The sequence of work is a numbered list — edit, add or remove steps. Underneath, the risk table: each hazard with the possible risks (who might be harmed and how) and the required control measures, rated likelihood × severity on the 5×5 matrix. Add hazards from the library or your own.

3

PPE, emergencies, sign

Mandatory PPE one item per line (it prints as mandatory-sign chips); the competence cards for who is doing the work; permits, welfare, the nearest A&E and the emergency arrangements to settle before work starts. Sign on screen; the print carries the approval statement over a record-of-briefing table for the crew to sign. Free PDF; the editable Word version and your logo unlock with an email.

The rules, briefly

The risk assessment is the legal bit; the method statement is what clients ask for

The Management of Health and Safety at Work Regulations 1999 (regulation 3) require every employer and self-employed person to make a suitable and sufficient assessment of the risks to their workers and to anyone else affected by the work, and to record the significant findings where five or more people are employed. The Construction (Design and Management) Regulations 2015 require contractors to plan, manage and monitor their work so it is carried out without risk. Neither names a 'method statement' — it is the industry's standard way of showing how the work will be done safely, and principal contractors and clients ask for one with the risk assessment: the RAMS.

A RAMS is written for a specific task on a specific site by someone competent to assess it, briefed to the people doing the work, and reviewed when the work, the site or the people change. This page describes the mechanism; it is not health-and-safety advice.

What goes in the pack

Everything the six sections record

Reference, job number and revisionProject, site, client and site contactActivity and description of the workPersons at risk and minimum competencePersonnel and responsibilitiesSequence of workPlant and equipmentMandatory PPE as sign chipsCompetence and training cardsPermits, isolations and site rulesWelfare and first aid5×5 risk matrix legendHazard · possible risks · required control measuresEmergency arrangements and nearest A&EApproval statement and record of briefingYour logo
Quick starts

Five job types, filled in as a starting point

MEWP work

Scissor lift or boom: unsuitable equipment, untrained operator, defective machine, falls and ejection, entrapment, ground, overloading, weather, traffic, falling tools, overhead lines, rescue, unauthorised use — with the IPAF competence line and the ground-rescue emergency list.

Working at height

Towers, ladders and roofs: falls, fragile surfaces, falling tools, overhead lines, weather, handling the kit, the public.

Electrical installation

Dead working and proving dead, hidden cables, asbestos, dust, height, handling, an occupied house, fire — with the isolation sequence in the method.

Plumbing and heating

Hot work, scalding, electricity near water, asbestos lagging, handling, legionella, lofts and voids, water damage. Gas work is outside it.

General site work is the fifth. Every quick start is generic until you adapt it — the footer says so on the print.
Part of the job

Sits with the permits, the COSHH sheets and the toolbox talk

The RAMS is written first; the COSHH assessment covers the substances in it; the permit to work checks its controls on the day; the toolbox talk briefs the crew. FieldHive has a free form for each — and the standalone risk assessment and method statement generators if you only need one half.

Honest limits

A competent person prepares it. We supply the form.

This tool lays the pack out, does the matrix arithmetic and prints it. It does not assess your site, it does not know your task, and the hazard library is a starting point in FieldHive's wording — not a list of the hazards on your job. The person who signs Part A is responsible for the assessment being suitable and sufficient. None of this is health-and-safety advice.

The FieldHive app does not produce RAMS. This is a free standalone form. The PDF is free with no sign-up; the editable Word version and the logo upload unlock with an email.

Free PDF, no sign-up. Word on email. A record aid, not H&S advice.
Stay connected

Turn it into a connected job workflow

FieldHive keeps the enquiry, quote, job, invoice and payment connected — so it's built from the accepted quote instead of retyped, and the numbers carry through.

Enquiry→Quote→Job→Invoice→Payment
More free tools

Other free tools for your trade

More FieldHive document tools — and the calculators behind the figures.

Permit to Work Template

The same-day check that the RAMS controls are in place — general, height, confined space or electrical.

issue the permit →

Electrical Isolation Certificate

Each isolation point with its lock and notice, proving dead recorded, four sign-offs. One page.

record the isolation →

Construction COSHH Assessment Template

One sheet per substance — the hazards, routes and controls for what the RAMS brings on site.

assess the substances →

Toolbox Talk Template

Brief the crew on the RAMS and record who attended.

brief the crew →

Method Statement Generator

Part B on its own, when the client already has your risk assessment.

write the method statement →
FAQ

RAMS questions

Quick answers to the questions people ask most.

Get started

The RAMS is one document in the job

A RAMS pack is written for one task on one job. FieldHive keeps the enquiry, quote, job, invoice and payment connected for that customer — the RAMS is the one thing it leaves to you.

FieldHive logo
FieldHive brand mark
FieldHive brand mark

Management software built by trade professionals, for trade professionals.

© 2025 Fieldhive Ltd. All rights reserved.

Privacy Policy

Terms of Service

Cookie Policy

Company Registration No: 16741717

FieldHive logo
FieldHive brand mark
FieldHive brand mark

Management software built by trade professionals, for trade professionals.

© 2025 Fieldhive Ltd. All rights reserved.

Company Registration No: 16741717

FieldHive logo
FieldHive brand mark
FieldHive brand mark

Management software built by trade professionals, for trade professionals.

© 2025 Fieldhive Ltd. All rights reserved.

Privacy Policy

Terms of Service

Cookie Policy

Company Registration No: 16741717

FieldHive logo
FieldHive brand mark
FieldHive brand mark

Management software built by trade professionals, for trade professionals.

Company Registration No: 16741717

© 2025 Fieldhive Ltd. All rights reserved.

FieldHive logo
FieldHive brand mark
FieldHive brand mark

Management software built by trade professionals, for trade professionals.

© 2025 Fieldhive Ltd. All rights reserved.

Privacy Policy

Terms of Service

Cookie Policy

Company Registration No: 16741717