Risk Assessment Generator for Trades
Record a risk assessment properly — list each hazard, who's at risk, the controls in place, then rate likelihood × severity for an automatic risk score and residual risk. Structured on HSE's five steps, ready for working at height, construction and trade tasks. A tool to record an assessment a competent person has made — not health-and-safety advice. Free A4 PDF; editable Word on email.
1 Assessment
2 Hazards — rate likelihood × severity (1–5 each)
3 Notes
RISK ASSESSMENT
Task / activity
Assessor
| Hazard | Who & how | Controls | Risk | Further action | Residual |
|---|---|---|---|---|---|
| No hazards added yet | |||||
Export this risk assessment
The A4 PDF is free to download now. Enter your email once to unlock the editable Word version and add your own logo.
- Editable Word template — reword it and reuse it
- Your own logo on the document (PDF & Word)
Was this tool useful?
We keep our trade tools free to use — no sign-up to run them and no pop-ups. If it helped, an honest review helps us improve these tools and helps other trade businesses find them.
Leave an honest Google reviewReviews are optional. Please only review based on your genuine experience.Every "template" is a static form
The risk assessment templates that rank are static — HSE's own Word document, gov.uk files, university PDFs, or a consultancy form gated behind a lead-capture. You still do the risk-rating maths by hand.
This is interactive: enter the hazard and rate likelihood and severity, and it works out the risk score and flags the high ones for you.
Likelihood × severity, scored automatically
Give each hazard a likelihood (1–5) and a severity (1–5) and the tool multiplies them into a risk rating, colour-flagged low, medium or high, so the priorities jump out.
Then record the further controls and the residual risk, with an owner and a review date — the loop HSE expects.
Structured the way HSE tells you to
Identify the hazards
What could cause harm on this task.
Assess the risks
Who might be harmed, how likely and how serious — rate it.
Control the risks
Eliminate the hazard or put controls in place.
Record & review
Record the findings, then review after changes or incidents.
When it has to be in writing
Everyone must assess the risks of their work. You must record the significant findings in writing if you employ five or more people — and even below that, a written record is the simplest way to show you've done it.
A competent person must carry out the assessment; this tool records it, it doesn't make the judgements for you.
Working at height, construction, electrical — and method statements
Use it for the hazards trades actually face — working at height, construction, electrical, hot works, roofing and more — adding the hazards and controls that fit the task.
Pair the finished risk assessment with a method statement and you have a RAMS — the risk assessment and method statement package many principal contractors ask for.
A recording aid, not H&S advice
This helps a competent person record a risk assessment — it doesn't assess your site, choose your controls, or constitute health-and-safety or legal advice. The judgements are yours.
It follows HSE's five-step method (checked August 2026), but you must make sure the assessment genuinely reflects the task, and review it when things change.
Turn it into a connected job workflow
FieldHive keeps the enquiry, quote, job, invoice and payment connected — so it's built from the accepted quote instead of retyped, and the numbers carry through.
Other free tools for your trade
More FieldHive document tools — and the calculators behind the figures.
Construction Phase Plan Generator
A CDM 2015 construction phase plan built on HSE's six required sections, sized for a small or domestic job.
the CDM plan it feeds →Method Statement Generator
Write a method statement — the safe system of work — with a numbered sequence, PPE and plant. Pairs with a risk assessment as RAMS.
write the matching method statement →Work Order Generator
Authorise a job to start — agreed scope and price, who authorised it, sign to proceed.
authorise the assessed work →Site Diary Generator
Keep a dated daily site record — labour, deliveries, instructions, variations and delays — as evidence for a claim.
log safety on site →Job Sheet Generator
Record on-site work and capture a customer sign-off, then export a clean A4 PDF.
record the work done →Risk assessment questions
Quick answers to the questions people ask most.
Assess it, record it, review it
A recorded risk assessment is the foundation of a safe job. FieldHive helps you record one on the HSE structure — then pair it with a method statement to form your RAMS.



