FieldHive logo
Download free
FieldHive logo
Menu icon
Download free
FieldHive logo
Download free
FieldHive logo
Menu icon
Download free
FieldHive logo
Download free
FREE METHOD STATEMENT GENERATOR

Method Statement Generator

Method statement generator that sets out how a job will be done safely: a numbered sequence of work, the PPE, plant and people involved, and a link to your risk assessment so together they form your RAMS.

No account needed to use it · For UK construction & trades — pairs with the risk assessment as RAMS
Your details save automatically in this browser — nothing is sent anywhere.
Keeps you, your standard PPE and emergency text and the client; clears the task, steps and hazards; next number (MS-002).
Your branding on the method statement — logo in the header, your colour on the section bars
🖼️ Company logo
Header, top left. PNG, JPG or SVG.
🔒 Unlock free with your email ↓
🎨 Section bar colour
Your brand colour, or leave FieldHive blue.
🔓 The logo unlocks free with your email in the export panel — the PDF is free either way.

1 Project / task

2 Scope, people & kit

3 Sequence of work — the steps, in order

1

4 Hazards & emergencies

5 Prepared by

Signature — prepared by
Draw with a finger, mouse or stylus. Or leave it blank and sign the printed sheet.
The printed statement has a second box for the operatives briefed on it to sign.
The method statement as it prints — A4
This is the document as it prints. Long statements run onto a second sheet.

Export this method statement

The A4 PDF is free to download now. Enter your email once to unlock the editable Word version and add your own logo.

🔓 Unlock 2 extras with your email — free
  • Editable Word template — reword it and reuse it
  • Your own logo on the document (PDF & Word)
Free app

Doing this every week? Do it on your phone.

FieldHive keeps the quote, the job and the invoice together, so the next one starts from the job instead of a blank page — and your customer can pay online.

Start Free →Free plan · no card needed
The problem

The "template" results are the wrong document

Search ‘method statement template’ and you get static files and gated lead forms — the top government result is even a planning-consent document, not a safety one. Little of it helps you actually write a safe system of work.

This structures it for you: a numbered sequence of work, the PPE, plant and people, and a link to your risk assessment.

The safe system of work, laid out — not another blank file.
The wedge

A numbered safe system of work — linked to your risk assessment

A good method statement describes, step by step, how the task will be done safely. This gives you a numbered sequence of work plus the PPE, plant and personnel, so nothing is left implied.

Reference your risk assessment and the two together become your RAMS — built on the same structure, in the same place.

The pairing

Risk assessment + method statement = RAMS

Risk assessment

Identifies the hazards and rates the risk — the what could go wrong.

Method statement

Describes the safe system of work step by step — the how we do it safely.

Together they are RAMS — what principal contractors ask for before trades start on site.
What goes in

Everything a method statement needs

Project / task & siteScope of workPersonnel & responsibilitiesPPE requiredPlant & equipmentNumbered sequence of workHazards & controls (from the RA)Emergency arrangements
Enough to brief the team and hand over on site.
How it works

A method statement in three steps

From the task to a briefed, downloadable document.

1

Set the task & the team

The project, scope, who’s doing it, and the PPE and plant involved.

2

Write the sequence

Add the steps in order — the safe system of work, numbered automatically.

3

Link the RA & download

Reference your risk assessment, then download the PDF or editable Word for briefing and sign-off.

Honest limits

A document aid, not H&S advice

The law requires a safe system of work (Health and Safety at Work etc. Act 1974, s2). A method statement documents that system — it isn't itself a named statutory form, and this tool doesn't decide what's safe for your task.

It's a document aid; a competent person is responsible for the content and the safe system of work. This isn't health-and-safety or legal advice.

The FieldHive app

Turn it into a connected job workflow

FieldHive keeps the enquiry, quote, job, invoice and payment connected — so it's built from the accepted quote instead of retyped, and the numbers carry through. Your customer can accept the quote and pay the invoice online, and it all syncs to Xero or QuickBooks.

Enquiry→Quote→Job→Invoice→Payment
  • Free plan, no card needed. Unlimited customers and invoices on the free plan.
  • £14.99 a month for the whole business when you need more, such as unlimited quotes.
  • Stop paying and you keep the free plan, with your customers, quotes and invoices.
  • Syncs with Xero and QuickBooks, and customers pay by card through Stripe.

Start on the free plan, because it should earn its keep before you pay anything.

FieldHive invoices on iPhone, showing paid and unpaid
Every invoice, paid and unpaid, on your phone
Works withXeroQuickBooksStripeMicrosoft Outlook
FAQ

Method statement questions

Quick answers to the questions people ask most.

More free tools

Other free tools for your trade

More FieldHive document tools — and the calculators behind the figures.

Risk Assessment Generator

Record a risk assessment with an automatic likelihood × severity rating, structured on HSE's 5 steps.

the risk assessment for your RAMS →

RAMS Template

The job and the sequence of work first, then the risk table underneath — hazard, possible risks, required controls — with PPE and emergency arrangements. Quick starts for MEWP, height, electrical, plumbing and site work. Free A4 PDF.

the RAMS pack — both halves together →

Toolbox Talk Template

Pick a topic, brief the crew and record who attended — a free toolbox talk template with a signed attendance register on one A4 PDF.

brief the crew before they start →

Construction Phase Plan Generator

A CDM 2015 construction phase plan built on HSE's six required sections, sized for a small or domestic job.

the CDM plan it supports →

Hot Works Permit Template

Complete a hot works permit on screen — validity window, precautions checklist, timed fire watch and four signatures — and download a branded A4 PDF free.

permit the hot work →

Construction COSHH Assessment Template

Fill in a construction COSHH assessment on screen — one sheet per substance, with cement, silica dust, MDF, expanding foam, solvents, flux fume and more pre-filled from a trade library — and download a branded A4 PDF free.

Construction COSHH Assessment Template →
Keep these tools free

Found it useful?

These tools are free, with no sign-up to use them. Three small ways to help them reach other trade businesses.

Leave a review

An honest Google review helps us improve these tools and helps other trade businesses find them.

Leave an honest Google reviewOptional. Please only review based on your genuine experience.
Google preferred sources

Want more FieldHive tools in your Google results?

Google lets you choose the sites you want to see more of. Add FieldHive as a preferred source and our free trade tools show up more often when you search.

Add FieldHive as a preferred sourceOne click. You can change it any time in your Google settings.
Want this tool on your own website? It's free.
Get started

RAMS, without the wrestling

A method statement and a risk assessment make your RAMS. FieldHive gives you both on the same structure — so the pack you hand the principal contractor is consistent.

Free plan, no card needed · then £14.99 a month for the whole business. Start free, because it should earn its keep first.

FieldHive logo
FieldHive brand mark
FieldHive brand mark

Management software built by trade professionals, for trade professionals.

QUICK LINKS

© 2025 Fieldhive Ltd. All rights reserved.

Privacy Policy

Terms of Service

Cookie Policy

Company Registration No: 16741717

FieldHive logo
FieldHive brand mark
FieldHive brand mark

Management software built by trade professionals, for trade professionals.

QUICK LINKS

© 2025 Fieldhive Ltd. All rights reserved.

Company Registration No: 16741717

FieldHive logo
FieldHive brand mark
FieldHive brand mark

Management software built by trade professionals, for trade professionals.

QUICK LINKS

© 2025 Fieldhive Ltd. All rights reserved.

Privacy Policy

Terms of Service

Cookie Policy

Company Registration No: 16741717

FieldHive logo
FieldHive brand mark
FieldHive brand mark

Management software built by trade professionals, for trade professionals.

QUICK LINKS

Company Registration No: 16741717

© 2025 Fieldhive Ltd. All rights reserved.

FieldHive logo
FieldHive brand mark
FieldHive brand mark

Management software built by trade professionals, for trade professionals.

QUICK LINKS

© 2025 Fieldhive Ltd. All rights reserved.

Privacy Policy

Terms of Service

Cookie Policy

Company Registration No: 16741717

-->