FREE CONSTRUCTION PHASE PLAN GENERATOR

Construction Phase Plan Generator

Construction phase plan built on HSE's six required sections under CDM 2015 — project details, roles, site rules, controlling significant risks, welfare and emergencies — kept proportionate to a small or domestic job. A document aid you complete; you stay responsible for the content. Free A4 PDF; editable Word on email.

No account needed to use it · Built for UK builders and contractors under CDM 2015
Your details save automatically in this browser — nothing is sent anywhere.
Keeps you as principal contractor, your welfare, site rules and emergency text; clears the project and its risks.· Your firm, standard welfare, rules, emergency text, signature and logo are remembered on this device —
Your branding on the plan — logo in the header, your colour on the section bars
🖼️ Company logo
Header, top left. PNG, JPG or SVG.
🔒 Unlock free with your email ↓
🎨 Section bar colour
Your brand colour, or leave FieldHive blue.
🔓 The logo unlocks free with your email in the export panel — the PDF is free either way.

1 Project

2 Roles (CDM 2015)

3 Significant risks & controls

Significant riskControl arrangement

4 Welfare, rules & emergency

5 Prepared by

Signature — prepared by
Draw with a finger, mouse or stylus. Or leave it blank and sign the printed sheet.
The plan as it prints — A4
This is the document as it prints. Long plans run onto a second sheet.

Export this plan

The A4 PDF is free to download now. Enter your email once to unlock the editable Word version and add your own logo.

🔓 Unlock 2 extras with your email — free
  • Editable Word template — reword it and reuse it
  • Your own logo on the document (PDF & Word)
Google preferred sources

Want more FieldHive tools in your Google results?

Google lets you choose the sites you want to see more of. Add FieldHive as a preferred source and our free trade tools show up more often when you search.

Add FieldHive as a preferred sourceOne click. You can change it any time in your Google settings.
Want this tool on your own website? It's free.

Was this tool useful?

We keep our trade tools free to use — no sign-up to run them and no pop-ups. If it helped, an honest review helps us improve these tools and helps other trade businesses find them.

Leave an honest Google reviewReviews are optional. Please only review based on your genuine experience.
The problem

The templates are gated, paid, or someone else’s job

Look for a construction phase plan template and you get email-gated downloads, paid CITB packs, or a filled council example PDF you can't edit. For a small builder on a domestic job, none of it fits.

This is a free browser generator built on the sections HSE actually requires — you fill it in and download it, no gate, no fee.

Built on the HSE structure, sized for a small or domestic job.
The wedge

Structured on HSE’s six required sections

Project & description detailsManagement of the work (roles)Site rulesArrangements for controlling significant risksWelfare arrangementsEmergency procedures
The six areas HSE lists for a construction phase plan (HSE CIS80, checked Aug 2026).
Do you need one?

Yes — on every construction project

Under CDM 2015 a construction phase plan is required for every construction project, including domestic work. Where there's one contractor they prepare it; where there's more than one, the principal contractor does.

It must be ready before construction work starts and kept as a live document, updated as the job changes. Keep it proportionate — a small job needs a short, focused plan, not a ring binder.

F10, separately

Notifiable projects and the F10

A construction phase plan is always needed. Notifying HSE with an F10 is separate — only required where a project is expected to last more than 30 working days with more than 20 workers at once, or exceed 500 person-days.

The tool has an F10 field for when it applies, but the plan itself is needed either way.

How it works

A plan in a few steps

From project details to a downloadable plan.

1

Project & roles

Project details, the client, and who’s principal designer and principal contractor.

2

Risks, welfare & rules

List the significant risks and how you’ll control them, plus welfare, site rules and emergencies.

3

Download & keep live

Download the PDF or editable Word, and update it as the job changes.

Honest limits

An aid, not health-and-safety advice

This helps you produce a construction phase plan in the right shape — it doesn't assess your site, and it isn't health-and-safety or legal advice. You are responsible for the content, its suitability, and the competence behind it.

The structure follows HSE guidance (CIS80, checked August 2026), but rules and circumstances vary — make sure the plan genuinely reflects your project.

Stay connected

Turn it into a connected job workflow

FieldHive keeps the enquiry, quote, job, invoice and payment connected — so it's built from the accepted quote instead of retyped, and the numbers carry through.

Enquiry→Quote→Job→Invoice→Payment
More free tools

Other free tools for your trade

More FieldHive document tools — and the calculators behind the figures.

Risk Assessment Generator

Record a risk assessment with an automatic likelihood × severity rating, structured on HSE's 5 steps.

record the site risk assessments →

Work Order Generator

Authorise a job to start — agreed scope and price, who authorised it, sign to proceed.

authorise the work →

Site Diary Generator

Keep a dated daily site record — labour, deliveries, instructions, variations and delays — as evidence for a claim.

keep the daily site record →

Method Statement Generator

Write a method statement — the safe system of work — with a numbered sequence, PPE and plant. Pairs with a risk assessment as RAMS.

Method Statement Generator →

Toolbox Talk Template

Pick a topic, brief the crew and record who attended — a free toolbox talk template with a signed attendance register on one A4 PDF.

Toolbox Talk Template →

RAMS Template

The job and the sequence of work first, then the risk table underneath — hazard, possible risks, required controls — with PPE and emergency arrangements. Quick starts for MEWP, height, electrical, plumbing and site work. Free A4 PDF.

RAMS Template →
FAQ

Construction phase plan questions

Quick answers to the questions people ask most.

Get started

Start every project on the right footing

A construction phase plan is where a compliant job starts. FieldHive helps you produce one built on the HSE structure — then keeps your job records alongside it.

FieldHive logo
FieldHive brand mark
FieldHive brand mark

Management software built by trade professionals, for trade professionals.

© 2025 Fieldhive Ltd. All rights reserved.

Privacy Policy

Terms of Service

Cookie Policy

Company Registration No: 16741717

FieldHive logo
FieldHive brand mark
FieldHive brand mark

Management software built by trade professionals, for trade professionals.

© 2025 Fieldhive Ltd. All rights reserved.

Company Registration No: 16741717

FieldHive logo
FieldHive brand mark
FieldHive brand mark

Management software built by trade professionals, for trade professionals.

© 2025 Fieldhive Ltd. All rights reserved.

Privacy Policy

Terms of Service

Cookie Policy

Company Registration No: 16741717

FieldHive logo
FieldHive brand mark
FieldHive brand mark

Management software built by trade professionals, for trade professionals.

Company Registration No: 16741717

© 2025 Fieldhive Ltd. All rights reserved.

FieldHive logo
FieldHive brand mark
FieldHive brand mark

Management software built by trade professionals, for trade professionals.

© 2025 Fieldhive Ltd. All rights reserved.

Privacy Policy

Terms of Service

Cookie Policy

Company Registration No: 16741717