Construction Phase Plan Generator
Produce a construction phase plan built on HSE's six required sections under CDM 2015 — project details, roles, site rules, controlling significant risks, welfare and emergencies — kept proportionate to a small or domestic job. A document aid you complete; you stay responsible for the content. Free A4 PDF; editable Word on email.
1 Project
2 Roles (CDM 2015)
3 Significant risks & controls
4 Welfare, rules & emergency
5 Sign-off
CONSTRUCTION PHASE PLAN
—
Project
Client
| Significant risk | Control arrangement |
|---|---|
| No risks added yet | |
Welfare arrangements
Export this plan
The A4 PDF is free to download now. Enter your email once to unlock the editable Word version and add your own logo.
- Editable Word template — reword it and reuse it
- Your own logo on the document (PDF & Word)
Was this tool useful?
We keep our trade tools free to use — no sign-up to run them and no pop-ups. If it helped, an honest review helps us improve these tools and helps other trade businesses find them.
Leave an honest Google reviewReviews are optional. Please only review based on your genuine experience.The templates are gated, paid, or someone else’s job
Look for a construction phase plan template and you get email-gated downloads, paid CITB packs, or a filled council example PDF you can't edit. For a small builder on a domestic job, none of it fits.
This is a free browser generator built on the sections HSE actually requires — you fill it in and download it, no gate, no fee.
Structured on HSE’s six required sections
Yes — on every construction project
Under CDM 2015 a construction phase plan is required for every construction project, including domestic work. Where there's one contractor they prepare it; where there's more than one, the principal contractor does.
It must be ready before construction work starts and kept as a live document, updated as the job changes. Keep it proportionate — a small job needs a short, focused plan, not a ring binder.
Notifiable projects and the F10
A construction phase plan is always needed. Notifying HSE with an F10 is separate — only required where a project is expected to last more than 30 working days with more than 20 workers at once, or exceed 500 person-days.
The tool has an F10 field for when it applies, but the plan itself is needed either way.
A plan in a few steps
From project details to a downloadable plan.
Project & roles
Project details, the client, and who’s principal designer and principal contractor.
Risks, welfare & rules
List the significant risks and how you’ll control them, plus welfare, site rules and emergencies.
Download & keep live
Download the PDF or editable Word, and update it as the job changes.
An aid, not health-and-safety advice
This helps you produce a construction phase plan in the right shape — it doesn't assess your site, and it isn't health-and-safety or legal advice. You are responsible for the content, its suitability, and the competence behind it.
The structure follows HSE guidance (CIS80, checked August 2026), but rules and circumstances vary — make sure the plan genuinely reflects your project.
Turn it into a connected job workflow
FieldHive keeps the enquiry, quote, job, invoice and payment connected — so it's built from the accepted quote instead of retyped, and the numbers carry through.
Other free tools for your trade
More FieldHive document tools — and the calculators behind the figures.
Risk Assessment Generator
Record a risk assessment with an automatic likelihood × severity rating, structured on HSE's 5 steps.
record the site risk assessments →Work Order Generator
Authorise a job to start — agreed scope and price, who authorised it, sign to proceed.
authorise the work →Site Diary Generator
Keep a dated daily site record — labour, deliveries, instructions, variations and delays — as evidence for a claim.
keep the daily site record →Method Statement Generator
Write a method statement — the safe system of work — with a numbered sequence, PPE and plant. Pairs with a risk assessment as RAMS.
Method Statement Generator →Job Sheet Generator
Record on-site work and capture a customer sign-off, then export a clean A4 PDF.
record the work done →Construction phase plan questions
Quick answers to the questions people ask most.
Start every project on the right footing
A construction phase plan is where a compliant job starts. FieldHive helps you produce one built on the HSE structure — then keeps your job records alongside it.